Service times

SAT, 5:30pm
SUN, 9 & 11am

 

Location

7413 Maxtown Road
Westerville, Ohio 43082

 

Contact

614-898-9412
info@heritagecc.org

 

Connect

    

WHAT IS THE FIXIT FUND?

The FIXIT campaign to raise $1 million for facility upgrades was introduced October 2018. The final amount pledged came to an amazing $1,230,868. Thanks be to God!

Perhaps even more exciting, in a church of roughly 500 households, we had commitments from 433 households.

FIXIT Update – 8/23

$1,013,686

given to FIXIT campaign

All renderings are approximate only. Finished products may vary in details and features.

UPDATES – AUG 29
UPDATES – JUL 25

EXTERIOR & ENCLOSURES

We are diligently working behind the scenes to get the exterior project started. There have been a few delays with the donated siding product and with the need to choose a different product for the curves on the building. This has been a slower start than we had hoped, but it is coming. We are praying and trusting in God’s timing for subcontractors and products to be aligned so that the project can be complete before winter.

INDOOR PLAYGROUND

We are grateful for the many volunteers that have gifted us with their artistic and painting talent and time in transforming Room 132 into an indoor playground area. The playground unit has been installed. The new space was introduced during Move Up weekend August 3/4.

SIGN

We are finalizing details with contractors to work on the base of the sign near the road, once that and the final permit comes in, the sign company will be ready to install our new monument sign that will include a digital messaging board.

PATHWAYS

As you’ll see below, the plans for Pathways moving to the ministry house had to change. Again, thanks to some wonderful Heritage volunteers, beautiful updates are currently happening to the waiting room and reception space.

UPDATES – APR 26

Ministry House

Unfortunately, a recent structural inspection of the mission house revealed issues with the initial and subsequent construction that compromised the floor joists integrity, requiring that most of the floor joists need replaced or repaired. In order to meet the Ohio Building Code required for the change of use from housing to meeting space, plumbing, heating, and electrical will also need to be redone since they were what compromised the floor joists. Based on the costs of those changes, it does not seem wise to continue to invest in the property. The house has served its purposes over the years. A recommendation was made by the FIXIT team, and the Governance Board has agreed, to tear it down. We are currently collecting quotes for that process and for ways to donate the housing materials. Thankfully, we still have a good home for Pathways inside the walls of Heritage.

Indoor Playground

Painting began last week in Rm 132, thank you to the volunteers that participated. More improvements are taking place in that space and the actual playground unit will be installed in July.

Carpet

The new carpet was installed on the floor of the auditorium the week of March 25th. Thank you to the group of volunteers that helped remove all the carpet off the walls and repair damaged walls in the auditorium. Please let an usher or facility staff know if/when there is a coffee spill so that we can stay on top of those potential stains.

UPDATES – MAR 1

The exterior project, including signage and new main entrance canopy, was presented to Genoa Township Department of Development and Zoning Commission on February 11. All has been approved to move forward.

In the original scope of the campaign, it was our desire to replace siding on the front of the building and then paint the existing siding on the rest of the building. God had something bigger in mind! We are beyond grateful to James Hardie, the manufacturer of the HARDIEPLANK and HARDIESHINGLE siding, for donating siding for the entire building and for the ministry house. We will end up with a better product that will last longer than we had even anticipated!

UPDATES

Main Entrance Mock Up

Indoor Playground Rendering

Auditorium Carpet Pattern

All renderings are approximate only. Finished products may vary in details and features.

BUILDING UPGRADES + REPAIRS

The prioritized list of upgrades and renovations includes:

MINISTRY HOUSE

Perform much-needed plumbing and maintenance repairs on the ministry house in the southeast corner of the parking lot.

AUDITORIUM CARPET

Replace 12 year old carpet in the auditorium.

EXTERIOR

Create a welcoming entrance to our church by replacing rotting siding, painting, adding new entrance and roadside signage, and landscaping.

PLAYGROUND

Construct an indoor playground in Room 132.

ENCLOSURES

Replace air conditioning unit and trash enclosures around the building.

STAGE LIGHTING

Replace failing lighting system for use during worship services and special events.

Additional updates and repairs will be considered if we exceed our fundraising goals.

PLEDGING/DONATING

Do you have more questions? Email them to fixitfund@heritagecc.org

All renderings are approximate only. Finished products may vary in details and features.